What you've already put in determines how much each following installment is worth

After this lesson, you'll know how to calculate what percentage of the price each mid-project installment should be based on what that phase actually costs, not split evenly.

By Yodai · Published on September 6, 2026 · Updated on October 12, 2026

7 min read

When you bill a big job in stages, the first thing to decide is how much you ask for before you touch the first piece of material. Then comes the question almost nobody gets right: how much each stage after that first payment is worth.

The quick answer, the one almost everyone gives, is to divide what's left by the number of installments remaining. If there are three, a third each. It sounds fair, it's easy to explain in a quote, and it's a mistake that costs you dearly halfway through the job.

One installment isn't worth the same as another because they don't cost the same. One takes up half your hours and almost no materials. Another forces you to buy expensive supplies before that phase even starts. If you charge the same for both, you work at a loss on the expensive one until the next payment comes in, and you cover that gap yourself, out of pocket, the whole time.

Each installment is worth what it costs, not whose turn it is

Take the whole job and break it into phases, not calendar dates. In a kitchen remodel, for example, there's a demolition and plumbing/electrical phase, a tiling and finishes phase, and a final handoff with touch-ups and inspection. Three phases, and each one carries a different weight in the price.

The demolition and installation phase takes the toughest hours and the priciest trades: plumber, electrician, labor that can't be pushed back or spread across several separate days. The finishes phase takes fewer hours but more visible material, the kind the customer sees and touches at the end. The final handoff is mostly inspection, touch-ups, and the warranty you sign off on when you close out the job. If you assign the same percentage to all three phases, the most expensive one stays underpaid for weeks, and the cheapest one hands you a cushion you don't need right there.

The rule is simple to apply even if it's not simple to calculate down to the penny: add up what each phase costs you in committed materials and hours of work, and that's the weight you give it in the final price. You don't need a detailed cost spreadsheet, an honest estimate is enough.

The demolition and installation phase carries the most weight, and what you charge for it should reflect that
PhaseWhat it costsShare of total price
Deposit, before touching materialMaterials ordered up front30%
Demolition and installationPlumber and electrician hours, labor that can't wait40%
Tiling and finishesVisible material, fewer work hours20%
Final handoffInspection, touch-ups, and warranty10%

If your business doesn't buy materials, time sets the weight

Not every business buys materials before a phase. If you sell web design, a training plan, or a marketing campaign, what matters isn't what you buy, it's the time each phase takes and the business you turn down while you're doing it.

For a website, the layout and content phase takes more hours than the final adjustments phase, even if both take up a similar number of days on the calendar. That installment carries more weight even though you haven't bought anything, because that's where you put in the days you couldn't spend on another client. Materials get replaced by hours, but the rule for weighing the installment stays exactly the same.

How to weigh a phase without knowing the exact cost

You'll almost never know the exact cost of each phase before the job starts. That doesn't change the rule: you need a rough yardstick, not equal shares split out of convenience.

Ask two questions per phase: how many hours of your time or your team's time go into it, and how much material you have to pay for before that phase starts. Add them up and compare against the other phases. You don't need the exact number, you need the order: which one weighs more, which one weighs less, and by how much.

If you're torn between two weights for the same phase, round up the one with more risk for you, not the one with more visible work. Risk is what you've already put out of your own pocket and haven't been paid back for yet.

How to weigh your next installment
  1. 1List the remaining phases
    After the deposit, write down the phases in the order you'll tackle them, without skipping any.
  2. 2Note the hours and materials for each phase
    For each phase, write down how many hours of labor it takes and how much material you need to pay for before starting it.
  3. 3Add it up and compare
    Add up the hours and materials for each phase separately, then compare each phase's total against the others.
  4. 4Turn it into a percentage
    Each phase's total, divided by the total for the job, gives you the percentage it gets in the quote.

What to tell the customer when one installment weighs more than the others

If the customer asks why the second installment is 40% instead of a third, the answer isn't about pricing, it's about the work. Tell them what happens in that phase: which trades are involved, what material gets paid for up front, how many days are packed into it.

You don't need to show your margin or your internal numbers. Just naming what happens in that phase is enough for the percentage to make sense on its own. A customer who reads "plumbing and electrical" understands why that stage carries more weight than the final walkthrough, without you having to justify it twice. And if you need to, show them the whole weight table: seeing all four stages side by side explains more than any argument would.

How to write it in the quote
Installment 1, before starting: 30% ($2,700). Installment 2, upon completing demolition and plumbing/electrical installation: 40% ($3,600). Installment 3, upon completing tiling and finishes: 20% ($1,800). Installment 4, final handoff and inspection: 10% ($900).
The mistake of splitting into equal parts
Three installments, a third each, is easy to say and easy to sell. The problem shows up if the customer stops the job right after paying the cheap installment and before paying the expensive one: you've already covered the plumber and electrician, and the money in your hand doesn't cover even half that phase. Splitting installments by what each one actually costs, not by whose turn it is, is what protects you from that moment. Better to work through that once, when you write the quote, than to discover it halfway through the job.

With this, you've got the price split into installments that weigh what they actually cost, not whose turn it is next. What's left is putting a date on each one and deciding what happens if an installment doesn't come through, and that's what's next.

What you'll walk away with
  • Each installment in the price weighs according to what that phase costs in hours and materials, not according to whose turn it is
  • The phase with the priciest labor, the most up-front material, or the most risk for you gets the highest percentage
  • You've got the weight table and the quote wording ready to use as is on your next job

Test yourself

Answer before opening each one. If one gives you trouble, go back to the section that explains it.

1. You sell bathroom remodels and split the price into three equal installments of 33%. The tiling phase costs you twice as much in materials as the demolition phase. What do you change?

What matters is the weight of each stage, not how many stages there are. For every phase, add up again the material and hours you're paying for before you bill it: if the extra tile you buy isn't balanced out by the hours spent on demolition, raise the tiling percentage and lower the demolition one. What carries weight is what you front out of your own pocket, in material and in hours, not what's visible.

2. You're a wedding photographer and you get paid in two installments: the day-of coverage and the edited delivery. Editing takes you fifteen hours and the coverage only eight, but your camera gear is already paid off. Which installment carries more weight?

The editing one. The weight is measured by what you put into that phase, and there, what you're putting in is hours, not equipment. Fifteen hours versus eight decide the percentage, not the day each thing happens or how impressive it looks to the client.

3. You're a tailor, and in the second installment you buy an expensive fabric the client chose. Should that installment carry the same weight as the other two just because there are three in total?

That stage absorbs the cost of the fabric on top of the cutting hours, so its percentage goes up even though the number of stages stays at three. The stage that forces you to front the most money out of your own pocket, in material or in hours, is the one that carries the most weight, whether it's the first, the second, or the last.

You already know how to work out the weight of each stage. All of that (stages, amounts, and which milestone triggers each payment) needs to be written down and signed before the first hour of work, not negotiated stage by stage as you go.

NextThe full payment schedule gets signed before the first hour of work